1. Request for environmental permit and change
Scope and classification
9. Completion of permit
Environmental Safety consulting
Environmental Safetyconsulting progress
2. On-site inspection of customer site
7. Conduct consulting and prepare documents
10. Receipt and delivery of certificate
3. Review and measure customer sites
6. Ordering
4. Write and submit a proposal
5. Review and consultation with client
The Hazard Prevention Plan is designed to prevent hazardous substances or risk factors that may occur during construction work through prior investigation.
This refers to a document written to establish a plan for safe work. It is a document that must be submitted in accordance with the Industrial Safety and Health Act and is limited to the manufacturing and construction industries.
Applicable target
Manufacturing
Machinery, equipment and facilities
Melting of metals or other minerals
Chemical facilities
Drying equipment
Gas assembly welding device
Facilities subject to permit, management, hazardous substances and dust work
Construction work
Buildings or artificial structures with a height of 31 meters or higher above ground, buildings with a total floor area of 30,000 sqr. or higher, or cultural and assembly facilities with a total floor area of 5,000 sqr. or higher (excluding exhibition halls, zoos, and botanical gardens), construction, remodeling, or dismantling of secondary education facilities, general hospitals among medical facilities, tourist accommodation facilities among accommodation facilities, underground shopping centers, or cold storage facilities.
This refers to a business that falls under any of the following categories and has a total rated capacity of 300 kW or more of electrical equipment.
Construction work such as bridge construction with a total floor area of 5,000 m2 or more
Construction of bridges with a maximum span length of 50 m or more
Construction work such as tunnel construction
Excavation work with a depth of 10m or more
Construction of multipurpose dams, power generation dams, and water-only dams with a storage capacity of 20 million tons or more, and local water supply dams, etc.
Submission deadline
Hazard and Risk Prevention Plan
Manufacturing: 15 days before commencement of construction
Construction: The day before commencement of construction